Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between "working stress method"
And "limit state method"?

Answer Posted / venkadeshwaran

In WSM the factor of safety of concrete is assumed to be 3 and factor of safety of steel is 1.8,so that it requires more percentage of steel and also in WSM the concrete and steel have a linear variation in elastic property.It is one of the main reason for failure of this method.
In LSM the factor of safety of concrete is assumed to be 1.5 and factor of safety of steel is 1.15.so that the percentage of steel rods used is very less when compared to the WSM.

Is This Answer Correct ?    43 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1955


For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate

1549


all technical question

2201


How many cum of 9.5mm stone in 1 ton ?

2494


in 100 cft = 1350 bricks in 100 cft = ? bloks

2934


what are the ffactors you considered choosing the course?

2118


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2394


how many minimum admixtures are used in water froofing structures

2282


what are the Task work of different labour.?

2577


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1934


Define What is made from large rocks, which protects the base of cliffs?

1024


What are the benefits of rcc pipes over steel designed pipes?

1373


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

2186


What is different between DI Pipe and CI pipe?

2080


Explain the various stages of the project planning process in construction?