what is the difference between rcc pipe (pressure or non-
pressure)and rcc hume pipe?
Answer Posted / bhupinder singh
Non presure pipes (NP1,NP2,NP3) can bear only water presure
upto 0.7kg/cm2 with maximum head of 7mtrs while the presure
pipes (P1,P2)can bear presure more than 0.7kg/cm2 with the
head of more than 7mtrs.
| Is This Answer Correct ? | 26 Yes | 1 No |
Post New Answer View All Answers
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how to calculate the scour depth
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How much does the leaning tower of pisa lean?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
how can i calculate cement in brickwork
in the earthquqke the profile of water on dam is parabolic or not
How many kilo-newtons equals 1000 kilogram?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What is the development length given in pile?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
What are the joints wants to made in masonry where door opening, arches like etc..
What Are The Steps Involved In The Concreting Process, Explain?
What is portland cement
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site