which"s we should use for concrete ppc or opc?
Answer Posted / tanuja
OPC is used for Concrete structure/also for masonry works
also/ But PPc can only used for Masonry works not fit to
use concrete structures. PPC is low heat of hydration no 1
for block/brick works/plastering/flooring works.
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
How to make a c++ program that converts any base to base 10?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
What are the applications of the modulus of elasticity?
How much cement and sand required for 9"brick wall per square metre
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
rate analysis hiring of generator 62.5 KVA
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Describe Briefly The Various Methods Of Concrete Curing?
how i can tak Quantity of mortar in block work
what is escalation?how it is done?
I need old MMUP exam question and answer for Civil engineering
Differentiate first angle & third angle projection?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
The foundations are placed below ground level, to increase?