Both OPC & ppc are used in concrete.but the usage depends on the strength of the concrete that we should achieve. Generally for low strength concrete that is up to 25Kn/ m2 we use ppc and higher the concrete strength we use OPC
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
what is the basic difference between Coloumn & Shear Wall
a butt weld is specified by
Why are the bolts that hold steel rails together in oval holes?
Define angular dimension?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
What are the techniques to measure road difference?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
What will you do if a portion of load bearing wall collapses under your supervision?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
five requirements of infill panels for walls?