How do you find the weight of rod per metre lenth ?
Answer Posted / lalwin
d2x.00617
| Is This Answer Correct ? | 11 Yes | 4 No |
Post New Answer View All Answers
What are new methods /technologies of pothole patching?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What is the difference between EPC,DBOOT and BOOT.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is the tallest man made structure in the world?
What is the use of array command?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is gravity flow?
how to calibrate the RM 800
Define What is Civil Engineering?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
how to clculate the %of concrete strenght achive after curing?load
In earth work 1300 cum soil how to calculate how many liters require in water
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.