Answer Posted / srinu.s
BOQ
s.no description of work l b h no qty unit rate totalamount
1 soilexcavation 5 5 5 1 625 m3 200 12500
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
how to caluclate sienerge qty in construction in ap
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
how to caliculate required amount of cement and sand required for 1cu.m.
which method is used in semi-rigid connection design??
What is the substitute of Mastic Asphalt?
why is the column design?
How we calculate the service time of buildings
pls give me ans to ACT formula cube testing porpuse
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
how to compute slab reinforcements on step by step procedures??
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What is the meaning of soil reinforcement?