BOQ
s.no description of work l b h no qty unit rate totalamount
1 soilexcavation 5 5 5 1 625 m3 200 12500
Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
how water proof chemicals act in concrete to avoid leek?
How to take labor charges for construction of 1cum of concrete?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What is Density of cement, sand & aggregate ?
Stringer How many cm goes to landind
what is civil all interview questions
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
What is a bearing capacity of soil?
How is calculate the cube molt
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
why building got air crack? if it get in one particular are what is means?