Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Describe the term BILL OF QUANTITY (BOQ)?

Answer Posted / srinu.s

BOQ
s.no description of work l b h no qty unit rate totalamount


1 soilexcavation 5 5 5 1 625 m3 200 12500

Is This Answer Correct ?    5 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to caluclate sienerge qty in construction in ap

2386


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2138


how to caliculate required amount of cement and sand required for 1cu.m.

2184


which method is used in semi-rigid connection design??

2262


What is the substitute of Mastic Asphalt?

8081


why is the column design?

2237


How we calculate the service time of buildings

1861


pls give me ans to ACT formula cube testing porpuse

3057


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

2248


how to compute slab reinforcements on step by step procedures??

5721


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

5201


does a b.tech civil engineer fresher supposed to know how to design rcc structure?

3436


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

2343


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1940


What is the meaning of soil reinforcement?

1140