How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / srinu.s
whenever is laps length calclated
dia of the bar* 50 times
| Is This Answer Correct ? | 202 Yes | 66 No |
Post New Answer View All Answers
why the profile of shell of natural draught cooling tower is hyperabolic.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Why was the empire state building made of steel?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
how calculate the bearing from two coordinates?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the difference between tsp & tower
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
How many square meter can a worker/labor demolish a structure per day?
what is column foundation
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What is costing in 100squre feet bricks
How many lbs are there in a yard?