Answer Posted / asaf
removal of load from supply over certain periods when demand
become greater than supply.load shdding is also known as
rolling blackout. load shedding are in response to
insufficient resources inability to meet demand for suuply.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What do you mean by ratio correction factor of instrument transformer?
What is EHT tariff or Power factor Tariff ????
Can anyone tell the proper diagram of star delta starter????
What are the different power system losses and how can it be eliminated?
Why lose 1 phase voltage in 33kv to 415v stepdown transformer
how does directional relay work incase of ac ?
whats the existence of reactive power and when it arises?
WHAT IS THE WINDING PROCEDURE OF ELECTRICAL MOTOR
How we can change the direction of rotation of Induction motor? Prove it using graphical
why we use two slope(differential & restraining) in differential relay.but in busbar protection differential we are using only one slope?please explain
How to select the cable and voltage drop in circuit?
how many Classification of fire extinguisher
in what type of applications v can use q meter?
What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.