what is the cover for column,beam & footing?

Answer Posted / joseph

.Cover should be not less than the nominal value corresponding to the relevant environmental category plus any
allowance for loss of cover due to abrasion.
Refer BS 8110-1 clause 3.3.7
but for your basic info : cover to column and beam should not be less than 3cm and for footing it should not be less than 7.5cm (where soil in contact) and 5 cm (where there is no contact with soil ).
But please go through the soil investigation report for the precise value.

regards
joseph

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2404


what is concrete canvas?

1770


What is factor not to be taken in consideration in mix design?

3082


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1822


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

762






Pls provide me with the calculation or codes related to de- shuttering of flat slabs

5911


what is Bearing Capacity,How to determine it?

804


strength of bitumen concrete with 80-100 & 60-70 grade bitumen

1659


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1669


what are the proper pipes for salt water line

1855


Define What is made from large rocks, which protects the base of cliffs?

657


Define mirror?

793


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1063


What are the different theories of failure under static load?

722


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1967