why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Answer Posted / suresh.s
the cement strength also prepared for 28 days
| Is This Answer Correct ? | 2 Yes | 10 No |
Post New Answer View All Answers
at which depth the construction of tunnel is economical from cost and engineering aspect.
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
what is the meaning of 40/20 src
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
how to calculate valuation for the old building?
give me the rate analysis for Bituminous Macadam and SDBC
what is the construction cost for per cft of multistorryed building in kolkata?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
can you give me the details of rate analysis of steel and concrete?
How long does it take concrete to harden?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
What is absolute coordinates?