why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Answer Posted / suresh.s
the cement strength also prepared for 28 days
| Is This Answer Correct ? | 2 Yes | 10 No |
Post New Answer View All Answers
What are advancements in civil engineering?
Define graphics window?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
For fine aggregate which is most suitable River sand or crusher sand & why ?
what is the formula for Mass of cement grout (Dg)=???
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
How to arrive dry volume of concrete (1.52 to 1.57) ?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
1:4:8 pcc calculation 591 cu.ft
What is the distance between railway tracks?
What is the difference between shear and tensile strength?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
why we use 19x9x9and 20x10x10 but not other