why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..

Answer Posted / joseph

The compressive strength is calculated at 3 ,7 ,28 days.if
you want to transport a precast structure of the grade
40/20 ,it should aquire 60% of design strength ..here it is
60% of 40.In seven days we shoul attain 75% of design
strength. Then your answer ; all the test cubes must attain
their 100% of design strength in 28 days. to ensure this
one we are taking test in 28 days .if cubes fail we have to
go for field test such as smith and hammer test or pulse
velosity (BS 12504 ).

Refer BS 1881 part 116
there are some factors to asses the test result

refer BS 6089

Is This Answer Correct ?    15 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is type failure of road surface? how to repair the failure of road surface?

1973


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

1627


how many cement used in single story residential building per sqft

1284


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

2637


States some of the commonly used commands in cad software’s?

755






why we create short columns under grade slab?

1836


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1659


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

1891


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1491


Are you ready to relocate with your immediate family to United States as a new employee?

4868


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2417


i want texture painting pwd data

1634


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1731


I need to constructive work in amaraj batteries

1390


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1327