Answer Posted / sohail malik sngpl pakistan
there is a very important difference b/w PLC and
DCS ....Basically in a process controll system plc is
sequential bases however DCS on loop control based.
explanation if in a PLC controlled system any Intrruption
or error signal generatd the whole system which is operated
bye this PLC effected and should be stopped and give Alarm
in fact in DCS system if there is any problem generated the
system give indication such problem but switch over to the
next loop or task which may not effected.
| Is This Answer Correct ? | 11 Yes | 7 No |
Post New Answer View All Answers
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What is the Working principle of Dozing valve?
Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com
sir, give me placement papers and interview quistion of birla group company of copper.
any body who gone thru recent iocl interview.INSTRUMENTATION questions. I need.
give me all the details about the interview and which type of question being asked
use of split range ? where it is used ? in which control loop it is used ?
hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.
I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID
Can any one tell me what type of question asked for instrumentation and control interview panel??? pls mail ramashankar.goel@gmail.com
Questions on flow meters,few questions on HART protocol,
hye SAM acn u send your e mail id, so that i can solve my query through e mail?
can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know