which testing we do during requirements?
a. white box testing
b. black box testing
c.both testing
d.none
Answer Posted / parimala
Blank box testing , becoz during requirement phase we will
do only requirement verificarion.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Explain glossary of software qa/testing?
Explain in a testing project what testing activities would you automate?
What is exhaustive testing?
What is open box testing?
Explain what n+1 testing is?
What Kinds of Testing should be followed for an web application while Manual Testing . Ie., Regression , Integration , Alpha , Beta , Performance , Stress ,Load , Back End(database)...etc What is the serial way to follow the above Testing Kinds in manual testing of any application. Plz clear my doubt.
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), what is the INPUT and OUTPUT of each stage?
What r all the resources u need 4 the project u r currently in?
On what basis you can arrive at an estimation for your project?
Explain structural testing?
What is fault masking explain with example?
What are the experience-based testing techniques?
What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering
What makes an inspection different from other review types?
Explain sanity testing?