Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS MEANT BY SYNCHRONISING IN GENSETS

Answer Posted / tamil

synchronizing means connecting more than one gensets of
same rating,same phase sequence and same frequency in
parallel

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the formula of starting current of 3phase and 1 phase motor???

2108


What is gain margin?

1084


What is Anemometer used to measure?

1126


for 11KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV UG system what will be typical per KM "R" "L" "C" parameter.

2457


if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.

1750


The specific heats of the gas at constant pressure and constant volume are respectively 1.0 kJ/kg K and 0.72 kJ/kg K; the value of R for the gas is

1137


what are the protecyion of transformer & generators

1978


how to calculate the mesh earth network resistance in such substation, is there any recommended resistance values with references , thanks!

2335


comparision between ACB and VCB

2364


What is the difference between voltages or potential difference? And what are they?

1077


How RTCC panel is working and give single line diagram for RTCC with transformer?

3110


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2637


what can be the causes of capacitor start motor having a higher current that its actual

1967


What are the types of the glands and difference between single and double compression type of cable Glands.

2085


formula for calculation of switchgears(i.e. contactor, fuse, cb, relay etc.), if load current is given?

2207