What is difference between FE-415 and FE-500???
Answer Posted / k manyam
Fe- 415
The yield stress is 415 N/Sq.mm
The yield stress is 500 N/Sq.mm
and other is rib spacing also differ
| Is This Answer Correct ? | 39 Yes | 1 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
where i can get material costs on weekly basis
What is the difference between EPC,DBOOT and BOOT.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
How to calculate Volume of Wet cement concrete for a specific grade?
what is education Cess.
How many litres of water used for curing of 1000sqft of slav
what is polity
What is meant by cartesian coordinate system?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
All aptitude question of Bechtel
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
what is the mix design for M:60 with micro silica andmetakaoline?
What is the difference between engineering stress and true stress?