What is difference between FE-415 and FE-500???
Answer Posted / k manyam
Fe- 415
The yield stress is 415 N/Sq.mm
The yield stress is 500 N/Sq.mm
and other is rib spacing also differ
| Is This Answer Correct ? | 39 Yes | 1 No |
Post New Answer View All Answers
Explain the latest method to detect a crack in a building?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What was asked in isro civil interview
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
it is a corrected question." make a list of engineering property(properties) of soil.
List out some of the software program that can be useful for architect?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
IS code for Rolling Margin of steel
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Why are steel plates inserted inside bearings in elastomeric bearings?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Questions related to civil.engg in company
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What are the different approaches in designing the floors of the service reservoirs?