Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS MEANT BY AEOLIAN SOIL?....

Answer Posted / k manyam

the soil which are formed by transportation of weathered of
rock material by the wind are called AEOLIAN Soils

Is This Answer Correct ?    40 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

2419


How to make a c++ program that converts any base to base 10?

2071


How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently

2548


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1885


Explain the latest method to detect a crack in a building?

1175


What is the difference between one-way slab and two-way slab?

1321


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1767


Slump Values for works?

2221


how do you stabilize a waterlogged area in road construction

6791


What are the applications of modulus of elasticity?

1396


pls tell me about method of cutting length of ties column

2600


Prepare a Schedule for a Highrised building from starting stage to Handover?

1987


Minimum concrete cover in slabs, columns, beams, foundation and other st?

1285


how to design and calculate materail quantity for concrete speedbreaker ?

5996


satart to end steps by step process of building construction...? i want to planning theme accuretly

1969