Answer Posted / biswas deb narayan
It depends on the mix used if it is M10 compressive
strength in 28 days will be 100Kg/cmsq.If it is M30
compressive strength in 28 days will be 300 kg/cmsq.
Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
how many litres of enamel paint required for 5000 sft of site??
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Explain what are the problems one might face while having a Cantilever balcony?
How do you change a dimension value in solidsworks?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
will fix foundation bolts at site with out template is there any procedure?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
what is the name of shuttering oil used in oman
what is the 0 value in quantity surveying
in the construction of residential building what type of tank are used?where?why & what is its purpose?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.