Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what will happen if we use earthing inplace of neutral for
domestic energy meter

Answer Posted / sai prasanna kumar ravipalli

the consumer will get benfit.because the energy meter will not work eventhough the consumer getting power.

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Has someone here done a sizing for a generator (3 phase), its for a pumping station. If you have an example for standby/duty and both running (I) star delta (ii) Soft Starter.

2124


we have one oven for 12 zone we are installed ir lamp in oven we control load from thyrister and 0 to 5vdc so our zone no 8 getting bright in fraction of second so what we do.. Please answer

1710


why motor range is available 22kv,30kv,37kv,45kv and so on? why motor range is not available 21kv,24,25,26,27kv and so on?

2785


please send me previous year questions of jspl through which i could prepare myself for the test.

1864


Difference between HRG and NGR. Are they both the same thing

4265


what is frequency response?

1127


HOW TO WORK A VFD?SAY SIMPLE METHOD

4393


How to maintain ac plant?

1933


what is the write prosidure of stringing of 8meter pcc pole.

2426


how to calculate the breaking capacity of different breakers.

2276


Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.

1954


i have completed deee and i've (June2012-feb 2015 experience in electrical maintenance in pvt ltd company.company having HT & LT electrical power.how to apply electrical C-license ,NOW I was resigned my job,what are requirements of applying for c-license

1715


Explain the method to keep noises low in a control system?

1114


What is the difference between relays and contactor construction wise?

2219


i have applied for junior engineer 2 c&w for Guwahati RRB please send me last five year question paper

2151