Answer Posted / rajeev
GENERALLY TOILET SIZE WAS 4'*3' AND ATTCH TIOLET WAS
5'*4'AND STIRE CASE SIZE IN WIDTH OF 4'OK
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
why we are useing plastic under the lean concrete?and whts the advantage?
what is the difference b/w full length and cutting length?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
in design case of structural member best suitrable percentage of steel limit is what
how to calculate MR 9(derivation)
What is the basic difference between OPC
psc girder detail
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
Mention what are the composition of a landfill?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
How to activate isometric axes in cad?
sir how can we find the cement and sand required for making 4" drop
Explain what is progress payment?