Why I-section is preferred to channel section?
Answer Posted / raja
MI IS ONE FACTOR.for resisting biaxial bending and to achieve lateral restaints more effectively in I -Section than C-Section.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Concrete cover for slab, column, beam and footing?
How do you convert wind speed into force?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
400 ku d/c clearess ketan hota hai?
In which code the the maximum height of concrete casting has been explained
how to calculate spacing rod in column
Consumption of Binding wire for fixing of cover block in vertical surface
is basic cost of the material includes tax?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
How do you change a dimension value in solidsworks?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
how much cement and sand required for 100sqm of wall plastering in different proportions