What are the loading factors to be considered for
transformer sizing/selection?
Answer Posted / omar aziz
1. Maximum Demand
2. Downstream equipment starting characteristics
3. Total downstream kVA
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
How to detect voltage vector shifting in interconnection protection.
HOW TO REDUCE POWER PLANT AUXILIARY POWER CONSUMPTION?
What are the special cables required for explosion proof wiring?
List some examples of renewable energy?
Define open loop control system.
we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain
draw 3 phase rectifier diagram
What are the electrical engineer roles and responsibilities in chemical plant?
how to select size of hardware for linking aluminium busbar is it depend on area of busbar or current flowing through bus bar
Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?
Dear all, I'm manikandan I have done by DIPLOMA EEE from 2011 , I have 5 years of experience from Power plant instrumentation field , which one field is give long life & which one field is best ,I confused a lot and also I'm studying AMIE, can I choose which department from Section B examination? pls tell me
how to calculate the earth fault current
What is contract demand in solar system?
How out of step protection relay works?