Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the the difference between piller base and wall base ?
give cost difference ?

Answer Posted / sjtbehera

Wall base foundation is generally construct where soil
bearing capacity is high. it is usally restricted to two
storeid buildg. it's cost is lower than pillar foundation
and usally construct where no recuired of modification

Pillar base found. is recuire where soil bearing capacity
is lower and heavy load structure. Generraly it is
construct in multi stotreid building.

Is This Answer Correct ?    21 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the different types of civil engineering?

1164


For what purpose bedding is used under storm water drains, explain?

1241


Please tell me vasthu room sizes. Thanks.

2236


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

2083


What is need for setting limits?

1144


What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers

2301


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7729


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

2447


What is the difference between undo & redo?

1269


Define What are the materials used in building a gravity dam?

1258


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2569


how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?

2134


What is an object snap mode?

1187


How to calculate brick work quantity?? Block work quantity??

2522


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1479