Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the the difference between piller base and wall base ?
give cost difference ?

Answer Posted / sjtbehera

Wall base foundation is generally construct where soil
bearing capacity is high. it is usally restricted to two
storeid buildg. it's cost is lower than pillar foundation
and usally construct where no recuired of modification

Pillar base found. is recuire where soil bearing capacity
is lower and heavy load structure. Generraly it is
construct in multi stotreid building.

Is This Answer Correct ?    21 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the diff between cad & cadd?

1118


What is the minimum size of the particles of silt soil?

1294


How can we demolish concrete beams?

2251


How can we make a hole in a solid rectangle using solidsworks?

1206


which method is used in semi-rigid connection design??

2210


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1906


how to calculate quantity of bricks in circular manhole with examples.

5590


How much cum. Brick work can do by 1 madon

1604


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1586


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1838


What is aggregate?

1085


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2217


How to decide/consider the grade of bitumen for dbm.

2179


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1659


Tell me about triple point of water.

1074