beam top main reinforcement(25mm) was drilled off by
mistakely when making drill hole for dummy columns. any one
can give useful information for this issue or related code
or websites.
Answer Posted / ashok kumar
Best method to fill up this hole by Epoxy grouting then go
after one/two hour for prescribed place of drill. it very simple
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Civil engineering material testing Standard results
what is castigliano theaorem
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Which is the most prominent tower of world?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is reinforced concrete?
What are the benefits of rcc pipes over steel designed pipes?
to minimize budget cost of building , what can i do
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
why the profile of shell of natural draught cooling tower is hyperabolic.
Differentiate orthographic and isometric projections?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
material used for mendrel use to bend epoxy coated rebar
What is M40 _ TOR - EQ and B.F.S