how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / jenu
Cement - 11.65 Kg
Sand - 0.43 cft
20mm - 0.86 Cft
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What are the causes of building collapse?
what is detail procedure of eccentric footing? plz. give solved exmple?
What are the benefits of rcc pipes over steel designed pipes?
Which are the Steel tests ?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
60-70 grade of Bitumen is VG-30 ?
If specific gravity of cement is less than 3.15 what is the cause?
How much cement,sand,bricks and water needed for 1square metre brick work?
Technical Question of Civil Engineering
very simple or less time consuming formula for reinforcement calculation by moment
what energized you to complete your course?
The definition of national highway
What are the problems one might face while having a Cantilever balcony?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building