Difference b/n Validation and verification?
Answer Posted / girish
Verification - (Are we building product right?)
For this-
1. Staic testing takes place in each & every phase of
project mang. life cycle (walk though, reveiws etc about
task)
2. We check that product making along with its
specification or not.
Validation - (Are we building right product?)
For this-
1. Dynamic Testing takes place in each & every madule when
completed. For testing we run each & every module.
2. Test these module & verfy those module work along with
its specification / customer expectation or not.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What kind of input do we need from the end user to begin proper testing?
What is the limit for test steps?It should be 10/20/30etc
how to write defects in excel sheets when defects occured
Can you please explain me how to do testing of an E-insurance project end to end process..
whats main working for tester. and developer, and prject manager.
Architectural structure of the insurance project?
If date field is a text field write test cases to validate it?
Login screen with Username, Password input fields,remember me check box,sign in and reset button write Test Cases for GUI, Funcitonal, Negative, Usability and Security testing.
Define cause effect graphing?
How does your preferred work style work with the ideal test-manager role that you just described? What is different between the way you work and the role you described?
Write test cases on duster
What are the different levels of manual testing?
how will the test plan is pepared in ur organisation>?
If I want to check compability of software in a MAC OS then which steps shold I follow?
Can any one suggest how to write the bug reports effectively by optimizing what we want to describe?