Bus-bar is made of which material & name of mostly used
material in bas-bar design ?
Answer Posted / p.phalgunarao
busbar is made of aluminium condutor.
this is mostly used in sub-stations
bus bar is 3 typs
1.al
2.cu
3tinned
| Is This Answer Correct ? | 17 Yes | 3 No |
Post New Answer View All Answers
What does the letter CTNM in negative phase sequence relay means?
what is differant beetween overload current and phase current?
how oil in the MOCB was reduced compared with OCB? what are the features of the MOCB?
what kn of disc is used in 33kv,132kv,220kv,400kv,800kv transmission line
how the speed of the gets motor regulated. does it draw the same current on the all speed level.
Explain about p.t?
Why does the radius of armature is less than the radius of pole shoe?
is it value of power factor is more than unit. whats effects in the source supply
How to Decide the Location of Earth pit for Compressor in Oil Depo? and How to measure the resistance of earth pit Pls explain me with the help of Circuit Diagram?
Explain about how is it working Earth fault'relay and wahts the resistance value of earth bed
The metal-enclosed switchgear and controlgear is subdivided into three types: 1. metal-clad switchgear and controlgear; 2. compartmented switchgear and controlgear 3. cubicle switchgear and controlgear. What is the main differnence between them. State some example.
where can i get vijaya electricals limited in hyderabad interview auestions can u give me the website address plz
What does the term power factor shows?
hi if anybody got model questions for cpcl Grade'A' electrical engineer position.send it to my mail please krishkumar22@gmail.com
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.