Answer Posted / sithathur ramamoorthy
mono block,centrifugal type is best upto 35 feet.upto 100
feet jet pump is best at low cost.upto 450 feet
aircompressor or bore well submercible is best.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
WHAT IS THE USE OF PIG TAIL IN WINDOW CT ?
How to check the LM324 Ic
how give earthing conection to household equipment?
Cb closed condition if there is a tcs fail whether cb will trip or not
How to check the thermocouple is correctly connected to cable for K type? (i,e positive pole is connected to non magnetic conductor and negative pole is connected to magnetic conductor)
what is vtg limit of earth and neutral at transformer side?
it is possible to measurement of tension of slipring induction motor(SRIM)carbon brushes, any maesuring instruments are available in the markets.
ratings of lightning arrester
What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?
how choose conductor&depending upon load
what is the write prosidure of stringing of 8meter pcc pole.
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
in control panel, how can i measuring the distance between one bus bar to another bus bar. then now only for bus bar. in mpcb and contactor also. that means one mpcb to another mpcb how much distance? how can i calculate that.
how to calculate the lightning arrester conductor @ no of earth pits required