Answer Posted / ramendra shukla
At the time of abnormal condition,testing or Maintenance
we can put our UPS as on Mannual By-pass mode.
it can also happens when By pass switch or auto control
operation has been failed.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is a surge supressor why its is used in synchronous generators
what is 400kv doble circuit quadpole tower?
what topics we have to concentrate for power grid et.written test.and tell what to read for english synonyms and antonyms.
Which standard we are following earthing resistance test
What is the need for a controller?
how will reduce the voltage. if 12volt/250ma transformer toreduce 6 volt
Is there any type of starter for DC motor other than two point,Three point and Four point starters?
what is subtransient , transient and steady stateac components
Write the force balance equation of ideal spring element.
how the aircraft outer body and inner body is separated ?
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.
what is frequency response?
ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH
sir plz send some previous year questions of jspl.