Answer Posted / anil kumar b s
PCC is the base layer of a Structure which will avoid
direct contact of reinforcement to the earth and avoid the
water content seepage to the structural member.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
How can you produce desired alloys and discuss their applications in daily life.
Are cruise ships built for the transatlantic run?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What are the advantages of cad software?
what is floating slab foundation?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
in 100 cft = 1350 bricks in 100 cft = ? bloks
Formula for calculation volume of essentric footing
What are the techniques to measure road difference?
What is the strength of cement?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Slab quantity
How to calculate sand , cement quantity for 23mm thk brick work(10x10)