Answer Posted / anil kumar b s
PCC is the base layer of a Structure which will avoid
direct contact of reinforcement to the earth and avoid the
water content seepage to the structural member.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
115mm thickness brick work how to required mortar
how much cement sand n bricks required in im3?and how much in plaster?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
how to calculate freeboard in under ground water tank and technical details
what is Short bored pile foundation.
The concrete slump recommended for beams and slabs; is?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
how clculate excavated or backfilling quantity by simpson's rule
How to calculate brick work quantity?? Block work quantity??
what is work of planning deptt. in any construction compny (in road project)
Which is the direction for positive angle?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having