Answer Posted / majed
for the standards weighs for different grades of concrete
that depend on the grade i think the question should be is
there different in the weight of one cubic meter for gardes
of concrete .yes there is different as example the weight
of one cubic meter of concrete foam equal 675 kg while the
weight of cubic meter from reinforcement concrete equal
2400 kg
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Which code is used for tor & tmt steel bar?
how to identify np3 pipe and np4 pipe
how to calculate quantity of bricks in circular manhole with examples.
Why you are leaving present job?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how i can tak Quantity of mortar in block work
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
What tor stands for in tor steel?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
How to fix toll charge for a particular vehicle at toll booths in a highway?
What is the substitute of Mastic Asphalt?
What is the zero value in quantity surveying