Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / santosh
volume of trapezoidal footing = H/3{a1+a2+square root a1.a2}
here a1 = area in bottom of footing
a2 = area in top of footing
H = height of footing
if there is any doubt then call me on 09907027855
| Is This Answer Correct ? | 100 Yes | 32 No |
Post New Answer View All Answers
What is the difference between linear dimension and aligned dimension?
How can i display 5 asterisk and another 5 asterisk )?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
what is Brick crushing strength(PSI)?
Who built the sears tower?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?