Answer Posted / jatin arora
Dr. karl von terzaghi
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What is the difference between engineering stress and true stress?
how can we calculate steel value, depending on load
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What do we mean by partial moment release ??
why do we not deduct volume of steel to find actual volume of concrete in practical???
pls give me some basic informations in construction of a structure?
In Rcc ratio calculation I wanted to know quantity of Steel also.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
can any one explain bar bending schedule of bems and columns and slabs ??
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
what is the list of building construction equipment & teir output?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.