Why did you choose this career?

Answer Posted / jatin arora

civil engineering has a very wide scope as compared to other branches. overall my interest is to design major structures. it is well said that civil engineer is next creator on earth after god. thats why i choose civil engineering as my career

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the common ways of demolition?

718


how to disign cuplock shuttering and it's matireal requirement snd any related web site

2516


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

1870


what is mc arther pile?

1777


how to calculate total cost for slab 35'×8'

1512






The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2305


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

1591


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1849


what is E VALUE FOR WOOD

1523


Explain the latest method to detect a crack in a building?

676


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1691


What is structural frames or systems?

641


How to make a c++ program that converts any base to base 10?

1621


Define What is the best type of wood glue?

655


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4154