for ex 1 m3 of concrete
conc 1;4;8
cement = 0.45 m3 of mix =1440x0.45/4=162kgs or 3.24 bag
sand = 0.45m3
40mm aggregate = 0.90m3
Is This Answer Correct ? | 22 Yes | 18 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What Reinforcements Are Used In The Process Of Prestressing?
how much used soil in 1 brick of standard size?
How to make tiles floor step by step procedure?
How to cal. The weight of hollow pipe?
How to get MEP technical,instaaltion & testing data for interview?
what is pouring and explain
How to design staircase.plz tell me formula for the design the staircase.
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
how to find out hard strata in bored pile when the DMC method adopted.
what is the tensile strength of 10swg and 8swg gabion wire?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
what pressure the NP2 class RCC pipe can sustain?