Do you know differenence between design mix and nominal
mix?
Answer Posted / suresh
every mix has proportion.nominal mmix mainly used un
important works like as the ratio 1;4;8@1;5;10.but design
mix means proportion of cncrete required as per the slab or
beam or any other reinforcement design strength.
it means simply compressive strength of concrete (it
means proportion of concrete) should be equvalent to the
tensile strength of steel
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
in design case of structural member best suitrable percentage of steel limit is what
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the substitute of Mastic Asphalt?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
can i get hindi version of is codes based on civil engineering?
How to do base isolation using ETABS software?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Why reinforcement done in shorter span in two way slabs
how u design STAGING for Superstructure in BRIDGE construction?
The 4 main factors to start a construction project are––
what will be price of 1:2:4pcc per kg?