4. What is your philosophy / attitude towards work?
Answer Posted / bala
* Safety first.
* Never to say i know, for what i really dont know.
* Never to do a mistake or giving green sign to a wrong
work which i am very much aware of.
* Doubt, clear first
* Every thing should be 100 percent.
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
I am called for interview from north east power plant .so, I need some interview question which may help me.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
How to calculate the quantity of ingredients of M20 grade concrete?
plz.show development and anchorage length in simple diagram.
what are the layers of the national and heir aprox thickness??
How much is the cover for slab?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how to absorb to site basic corrections? which are the important correction?
How to cal. The weight of hollow pipe?
in one SQM plaster how much Cement and sand consumed in ratio 1:4