what means if slump is less than 25mm and greater than 80mm?
Answer Posted / bala
1.Slump from 10mm to 30mm - poorly mobile mix.
2.Slump from 80mm to 150mm - for all normal RCC work.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
what are the duties of Site Engineer in work site?
What are the methods of measurement? Describe it shortly
What is the sugested procedure of water purification for public supply?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
how many material required for brickbat water proofing of toilets.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
How much cement and water required for cement selery????
Why is concrete cube test carried out?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
400 ku d/c clearess ketan hota hai?
what else we can add rather than admixture in concrete to reduce the cement quantity?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
How to compute minimum number of columns required for a site from area of site?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Questions related to civil.engg in company