Difference between Hydro Pneumatic and Gravity system of
water supply in a building?
Answer Posted / bala
* I agree Mr.Dushyant.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the release of lien?
What is the biggest dam in america?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
What are the causes of building collapse?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
how much to get of BRC lapping in full yield and half yield ?
Which stone is best for wall construction Laterite Stone or Cement Blocks
How many types of slabs are there & how to design it?