Answer Posted / bala
1.you can see clear view of slab and intermediate column
joint after de shuttering, it is the right place to explain
punching shear, you know how the slab self load acts,
towards the gravity (downwards) at the same time the column
located below the slab holds and punch upward this is where
the puching shear occurs(the surrounding small area of slab
around the column)that's y u can see top and bottom cross
rods arround that junction.
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
five benefits of using standard terminology in the measurement process
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Will water damage concrete?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
Why reinforcement done in shorter span in two way slabs
When column of building is abutting the boundary line,then suitable footing advised is
mean of NH4 pipe
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
Define What is made from large rocks, which protects the base of cliffs?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
pls tell me about method of cutting length of ties column
1m square 20mm plastering how much of water need curing work
what is the difference between np2 and np3 concrete mix
What is the difference between undo & redo?