Answer Posted / bala
1.you can see clear view of slab and intermediate column
joint after de shuttering, it is the right place to explain
punching shear, you know how the slab self load acts,
towards the gravity (downwards) at the same time the column
located below the slab holds and punch upward this is where
the puching shear occurs(the surrounding small area of slab
around the column)that's y u can see top and bottom cross
rods arround that junction.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Why we provide hair pin for shed
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Define aligned dimension?
how can calculate cutting length of diamond ring
psc girder detail
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
What is the average density of soil?
Why was the empire state building made of steel?
material used for mendrel use to bend epoxy coated rebar
How much quantity of cement,sand,stone used to build 1 cum of cc road??
to minimize budget cost of building , what can i do
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Discuss some applications of modular elasticity?