Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Sir,
why generating power plant operating at above 0.9 lag?
detail explaination?

Answer Posted / sanu chaudhary

armature current of alternator depends upon the power
factor of machine .AT THE UNITY POWER FACTOR armature
current is minimum ,armature current of machine will
increse for same power if power factor of machine is
lagging as well as leading so it is desired to run the
machine near the unity power factor for optimum utilisation
of capacity of machine .in the leadind power factor machine
take reactive power from the infinte bus or grid and
machine is under excitation so it may be the cause of
panelty from power corporation due to reaciving of reactive
power hence we operate the machine near .9 lagging power
factor

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

2228


what is mind in cable

2134


How will polarity test of Dy5 Transformer ?

2263


What are the classifications of oscillators?

1138


for a 400kv t/m line with 10 ampere current will corona occur?

2250


what is 3rd Harmonics? how it is generated in alternator

9587


how we arrange the hv side with delta connection in case 33/11kv of transformer.

2045


How the PF control while running DG set with load

2216


How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.

2217


a simple c++ program to calculate simple interst with its data members as private

1919


The synchronous machine excitation system explain

1876


rajha power sector details

2099


Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?

2150


dear all i am kumara now current working in electrical designing of control and relay panel i want learn some substaion design then any book are available. pls mention name and authour

1988


what happens if earth of 33kv cable is not connected to earthing pits? please send this query's answer to ngrm.sudha249@gmail.com

2093