What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker
How to calculate approximate load loss of a distribution transformer by knowing %ge imp of transformer?
What is CVT and what is relation with wave trap?
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
in HT service 3ph 4 wire service Y-phase voltage shows zero . whether it is meter fault? or what be the reason ? if y-ph voltage zero ,can current is recorded? reasons for failure?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
What is meant by load angle of an alternator? Upon what factors does the load angle depend?
What is the formula to find out two phase active & reactive power
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?
why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?
what is the reactive power what is the use of it in system
I am B.E.electrical engineer having 7 years of experience in Transformer testing upto 315 MVA.I want to khow how I can get the 'Electrical Valuer' License.
List few applications of d.c series motor?