wat is d first thing to be seen 2 lay a cable in a
particular area??
Answer Posted / sridhar
1. to identify the source & the destination
2. to identify the classification of Zones.
3. identify the shortest / nearest route to avoid max.
length of the cable & to avoid road crossing
4. to select the cable size wrt load & route length
5. to select the cable size wrt load, calculate the
starting & running voltage drop.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Explain about 3 phase motor fault current calculation with examples?
Whether amorphous core transformer is commercialized or not:Name of company making amorphous core transformer and what are different rating?
What is the meaning of Insulation H for transformers????
How to calculate fault level of 11 KV system
what are types of encoder
What is meant by analogous system?
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan
Why GRR starts from 60% of motor speed why not less than 60%?
How Calculet The UPS AH In Load
What is meant by positive and negative feedback?
what would happen if reactive power (kvar)is increased (more)or decreased (less)? how much exact reactive power should be maintained? and what should be done for that
HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER
Why the power generated in dams is complex power? Why the generators in dams cannot produce Real power directly (i.e power which has zero reactive part)?
how to apply b license to c license in tneb
what is the sludge current