Answer Posted / dilip
it is a combination of proces and applicaton
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why is an excess-3 code is called an unweighted code?
Explain what is pulse logic system?
I had completed my diploma in electronics and communication. Currently am working with a pvt. ltd. (with two years of experiences) company which makes panel using plc, VFD(drivers) and scada monitoring system. so should i get supervisor licence for my supervisor post???
I applied for Airport Authority of india's Jr Executive (Electronics & ATC).So please anybody Guide & Send me the Previous Questions and syllabus of written Test? My mailID :anshuljaineng@yahoo.co.in
A PLL maintains lock by comparing A The phase of two signals B The frequency of two signals C The amplitude of two signals D None of these
What is simulator programme?
temperature transmitter range o to 100c over range set value 21.6ma if you give source on the field transmitter showing iop out put also 21.6ma but dcs not showing iop samething if you simulat from hart 21.6ma in dcs showing iop how its possible?
details of siemens automation systems.
IN A PN JUNCTION DIODE,( ON FORWARD BIAS ) WHEN ELECTRONS AND HOLES PAIRS MADE AND CURRENT FLOWS,THEIR IS NO END OF ELECTRONS AND HOLES IN A LITTLE SEMICONDUCTOR DEVICE.
Why is zener diode used as a voltage regulator?
What do you mean by a grounded load?
What is the right Step of Commissioning? (Commissioning, Hub Manager, Hardware)
Tell me how many mosfet switches are there in dynamic ram?
Define what is the difference between active and passive filters?
What is an idea current source?