what is the shuttering normal clear cover for footings,
walls, beams & columnms
Answer Posted / naasir
it depends on different conditions but normally
for columns 20mm
for footings 75mm
for beams 50mm
Is This Answer Correct ? | 4 Yes | 20 No |
Post New Answer View All Answers
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
How many types of slabs are there & how to design it?
Tell me about triple point of water.
2. What are the advantages of your present job, things you like about it?
please briefly explain calculating or estimating steel quantity for a RCC column?
explain the rale of the government in the construction industry
How to come 1.54 from dry to wet concrete?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
For the construction project what capital cost has to be taken in consideration?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)