what is the shuttering normal clear cover for footings,
walls, beams & columnms

Answer Posted / naasir

it depends on different conditions but normally
for columns 20mm
for footings 75mm
for beams 50mm

Is This Answer Correct ?    4 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

1663


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2141


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2030


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1950


How many types of slabs are there & how to design it?

762






Tell me about triple point of water.

671


2. What are the advantages of your present job, things you like about it?

2708


please briefly explain calculating or estimating steel quantity for a RCC column?

1438


explain the rale of the government in the construction industry

1911


How to come 1.54 from dry to wet concrete? 

1815


if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

1577


For the construction project what capital cost has to be taken in consideration?

673


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1707


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2611


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1544