Answer Posted / arulselvi.a
Development starts with information gathering. After the
requirements gathering BRS/CRS/URS will be prepared. This
is done by the Business Analyst.
During the requirements analysis all the requirements are
analyzed. at the end of this phase S/wRS is prepared. It
consists of the functional (customer requirements) + System
Requirements (h/w + S/w) requirements. It is prepared by the
system analyst.
During the design phase two types of designs are done. HLDD
and LLDD. Tech Leads will be involved.
During the coding phase programs are developed by programmers.
During unit testing, they conduct program level testing with
the help of WBT techniques.
During the Integration Testing, the testers and programmers
or test programmers integrating the modules to test with
respect to HLDD.
During the system and functional testing the actual testers
are involved and conducts tests based on S/wRS.
During the UAT customer site people are also involved, and
they perform tests based on the BRS.
From the above model the small scale and medium scale
organizations are also conducts life cycle testing. But they
maintain separate team for functional and system testing.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is Lun masking? Why it is used?
What is branch coverage?
What is ansi - american national standards institute?
What is syntax?
Explain regression testing?
Which is the best institute in chennai to learn Softyware testing? Please help.
Explain quality control?
What are the types of disk array used in SAN?
What is quality policy?
Explain audit?
What is positive testing?
wat r d schedules for testing?
What is validation and verification testing?
Which technique can be used to achieve input and output coverage? It can be applied to human input, input via interfaces to a system, or interface parameters in integration testing.
When is it ideal that the testing is stopped?