I am an electrical contractor in noida, I am registereg in
noida vat. i got a contract in Delhi State, my party told
me that we shall deduct WCT @4% & reimburse Service tax all
in composite scheme.
Now Problem is this,
1 Can i able to purchase outside the delhi?
2 Can i produce a c form to our vendors?
3 What is limitation of purchase from outside the Delhi?
4 What % of tax Govt will levied upon me?
5 How can i take credit of tax paid upon purchase made by
us.
So, like these type questions i have in my mind if any
person know the right answer please write to
sksproj@gmail.com or contact me on - 8010076534 /
9212758177 / 9718378190.
Thanks with Best Regards,
S.K.Saxena
Answer Posted / kuppan
consult a Doctor
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In Power cable specification what is U0/U and Um.
How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.
why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?
Dear Sir/Madam, I have one questions we have three steam turbines and one Gas turbine and our industry linked with the public network, we have protection system one of the protection is reverse power we can export just four MW only i would like to ask about how to calculate the reverse power. Thank you in advance best regards
what are the parameters plays a major role in Potential transformer Burden calculation??
does a DG set has low fault level as compared to that of a transformer.If yes then why.
Salient pole alternator is more stable, why?
why we used dc supply for field in dg set
can anybody send me syllabus of rrb section engg (electrical). and also send previous question pepar...
What is the maximum and minimum rating of UPS?
Is there any specialised book to refer about fault level calculation both in MV and LV side??
how is control wiring coding is done in a CRP panel ?
Define super node?
Explain cmrr?
1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?