WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER?
WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN
TRANSFORMER?

Answer Posted / sunil ulange hit nidasoshi

Vector Groups are made especially to make out difference in
the connections. The connection can be delta(D) or star(Y)

The primary winding connection always denoted by Capital
Letter (D), and secondary winding connection always denoted
as small letter (y), and neutral n

The number after that indicates the phase difference
between the primary and the secondary voltage.

e.g.-> DYn11 means transformer is star connected with
secondary voltage leading the delta connected primary
voltage by 30 degrees.

normally distribution transformers are have Dyn11 connection
because secondary of transformer are connected to at user
end means motors,inductive load etc,

These loads always havelagging Power factor thatswhy Dyn11
connected transformer means secondary volatage leads by
primry voltage by 30 degrees, hence Power factor maintened
constant.

In Clock 11 indicates angle between 12 & 11 is 30 degrees
i.e. 360/12=30 degree

Sunil ulange
Application Engineer
Southern power equpment Limited bangalore

any Questions @ sunil_031@yahoo.com

Is This Answer Correct ?    16 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .

1481


If I have Energy Meter Ratio as 100:5 & Also I have CT Ratio as 50:5 then what will be my multiplying Factor(M.F.)

1533


Draw transformer phasor diagram.(full load,no load)

3685


Explain Energy and Power signals?

1273


what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me

1635






HOW WORK HEAT PLATE EXCHANGER

1510


what is package substation.how many types they have

1669


How to use computer cpu ups use for home inverter circuit board

1278


How can we decide cable size from HT panel to Transformer? Please give you reply with some examples.

1767


how to commissioning the genset with amf panel?

1884


During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.

1436


What is pi controller?

653


What is the name of transformers oil filteration equipment?

1582


why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?

1613


What is electrical cable termination

2211