Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we check the earth resistance

Answer Posted / deepak

By earth resistance tester that consist of 2 electrodes
along with its leads.Connect one lead from earthpit to
tester & burry 2 electrodes in earth & connect there
respective lead with tester & then check the earth R. It
should be from 0 to 1 Ohm.

Is This Answer Correct ?    12 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hello! sir i did three year of diploma in electrical (2007- 2010) and now i m a student of electrical engineering. sir can i apply for germany visa for study and part tome work over there?

1846


Why the dc voltage drop during starting of emergency lube oil pump? The Voltage drop from 135kv to 125 kv for one min. before re-establish to 135kv?

2310


Define steady state error.

1105


plz send me the procedure and syllabus for mseb exam

3868


why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?

1870


Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?

1407


Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.

2397


We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?

1645


hr round

2148


my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.

2067


Which power will flow first if we switch on a motor Active or Reactive? How?

5606


how to identify the cable quality and what is flame proof cable

2119


Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.

2127


What types domain of laplace transforms? What behavior can laplace transform predict how the system work?

1156


What is the HVDC Transmission System? What are the conditions applicable to lay an HVDC Line?

2305