Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Specific gravity of Cement? Water?

Answer Posted / sachin

cement 3.15 g/cc
water pure-1.00
water sea- 1.03

Is This Answer Correct ?    11 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3804


How much cement will require for 1Rmt Skirting laying

2286


How does a traffic light signal work ?

2277


How much cement and sand required for 9"brick wall per square metre

2909


what is the productivity in aluminium shuttering per day

2062


How do we calculate absolute pressure?

1338


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1606


strength of bitumen concrete with 80-100 & 60-70 grade bitumen

2098


What are the reasons for geotechnical site investigations in uganda?

1144


how to calculate reinforcment in staircase cranked beam?

2791


What are the advantages and disadvantages of using plastic and timber fenders?

1141


is concealed wiring a problem in fly ash brick wall?

2518


What is the difference between routing maintenance and major maintenance in school facilities?

1103


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3598


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2612