Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the steel quantity for beams & columns
also footing net?
what is the formulae for calculate the steel quantity?
what is mean by (100.3)plinth level?what is mean by 100.3?
explained it?

Answer Posted / sachin

TO calculate the steel qty first calculate the length of
steel as per drwg and multiply this length of steel to the
per meter wt. of the respective dia of steel. THIS GIVES
THE WT. OF STEEL IN KG.

100.3 plinth level indicates the RL of the plinth beam with
respect to the BM fixed for the plot plan.

Is This Answer Correct ?    32 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What will you do if you encounter problems like accidents?

951


how to workable concrete cube test M-25 design mix

3405


how to calculate the chair reinforcement length in slabs, footing or anywhere??

2331


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

2205


IS code for grade of concrete for bamboo lintel????

2103


Different sizes of Hollow blocks and its weight. Thanks.

2380


Why are the bolts that hold steel rails together in oval holes?

1104


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

2262


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2975


I am called for interview from north east power plant .so, I need some interview question which may help me.

1734


How to calculate Volume of Wet cement concrete for a specific grade?

2199


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

2474


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

1988


what else we can add rather than admixture in concrete to reduce the cement quantity?

6100


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1990